Science
Events
More
Contribute
LIGHTNING ON DEMAND
Engineering Details
Structural:
Bolt patterns for anchoring the front tubesteel structural columns, mounted on grade beam.
Underslab utilities and screed lines awaiting concrete.
Gravel fill, in one area with an unstable excavated face.
Detail of the front column bolt patterns.
Detail of the 4X4 column bolt pattern.
All structural steel in place.
Welding the steel hangers for the 6X12 beams.
3X12 floor ledgers bolted to the foundation walls.
Microlam pattern, around column (above)
Microlam pattern, around column (below)
Joist hangers, welded to I-Beam.
Column 'A' to glulam connection.
Column 'C' to glulam connection.
Stairs:
Mounting Plate, at top of exterior stairs
Plate Bolt Pattern to wall
Mounting Plate, at exterior landing
Plate Bolt Pattern to wall
Mounting Plate, at base of exterior stairs
Electrical:
Exterior Stair wall electrical 01
Exterior Stair wall electrical 02
Exterior Stair wall electrical 03
Front Window Mullions:
Mullion connection to glulam
Detail 1
Detail 2
Steel reinforcement inside mullion extrusions
Insulation:
Exterior wall at Entry Door
Exterior wall at Hot Tub
© Lightning On Demand 2019